Wednesday 26 June 2013

The Final day MONSTER job List


Job
When Deadline
Complete the 21 map sections
9.45
Critique and quality control map.
 
Each of the 21 sections transferred onto map in pencil checked by two others then over line with pen
 
Addition of waves and land block colouring on map
 
Bird pictures completed
 
Migratory stories Project title made
 
A key to the map is made
 
Mounting of bird pictures needs consistent design
 
Layout and background of board is designed
 
A summary of the project is written and mounted
 
A school logo is drawn
 
Thank yous and Credits for the production of the display is made.
 
Birds and map key, titles, summary, logo  and credits are mounted onto the display board
 

No comments:

Post a Comment